Wind Power: A Study to Determine the Feasibility of Utilizing Wind Power to Meet the Energy Demands of the M.J.U.S.D.
CSEF · 2002 Environmental Engineering
Overview
Objectives/Goals The formation of this project stemmed from the simple observation of a few facts. The wind, for one, has been around since the beginning of time. Enthusiastic environmental concerns have been around for about five decades. Rolling blackouts started to occur when CA State's energy supply suddenly dropped in the late spring of 2001. Moreover, recently the Muroc Joint Unified School District has plunged very low, almost to the level of a state take over due to lack of funds. Combining these few basic facts I formulated a project that would be envionmentally friendly, a power grid stabilizer, and economically smart for my school district because of the free price of the power source...WIND! Methods/Materials To begin my project, I collected 18 months of Edison billing data from my district and 12 months of hourly wind data from the Edwards AFB Flight Line wind sensors. I needed to enlist the help of both an ENRON Director of Electrical Engineering for expertise on what size wind turbine would be best and a sales engineer to prepare a non-binding bid proposal. I also needed to utilize several conversion formulas in order to interpret my data correctly. Wind and the factors that effect wind had to be researched as well as the topography of the area. Visits to the Tehachapi Wind Farms, the Tehachapi ENRON Manufacturing Facilities, as well as the Edwards AFB Weather Observing Office were vital to my understanding the key equipment and data needed for my project. Results I found that a 1.5 MW wind turbine would be the turbine of choice. The 1.5 MW wind turbine was found to generate enough kWh to supply the energy needs for the original 5 Edwards schools. It became obvious that there would also be enough energy to meet the entire district's energy needs as well. After calculating the difference between the district's energy consumption and the wind turbine's energy production, there was still enough energy left over to generate a 47% cushion for expansion, growth and possible sale. Conclusions/Discussion All things considered, wind energy appears to be an awesome alternative for the MJUSD. This project supports that wind is cost competitive and stable for our area, quick to permit and build, consumer and environmentally friendly, and a very reliable intermittent power supply. In an area where wind is abundant, it is feasible that a 1.5 MW wind turbine can meet the energy demands of the entire M.J.U.S.D..
Summary statement
The energy needs of the entire Muroc Joint Unified School District can be met by utilizing a 1.5 MW (mega-watt) wind turbine.
Help received
Peder Hansen: ENRON Sales Engineer prepared a non-binding bid for the 1.5 MW Wind Turbine.
Competition history
- CSEF 2002
Resources
Related projects
CSEF · 2009
Got Wind?
CSEF · 2009
Wind Power in Ventura: A Future Worth Examining
ISEF · 2014
Optimizing the Utilization of Wind Energy with an Alternative Engineering Design: A Horizontal Dual Motor Turbine, Phase II
CSEF · 2007
Wind Farming the Fertile Pavement of the San Joaquin Valley
CSEF · 2009
Potential Effectiveness of Solar vs. Wind Energy in Private Generation Systems
CSEF · 2011
The Power of Wind: A Wind Powered Electric Car
CSEF · 2005
Gone with the Wind: The Days of Oil Dependency
CSEF · 2012
Wired Up for Powerful Results
Closest projects by meaning, across every fair and year in the corpus.
Browse more like this
Source: California Science & Engineering Fair public projects