Systematic Wall Constructing Tool
ISEF · 2017 Engineering Mechanics Fourth Award
Overview
During brick wall construction, lots of material are wasted and there can be flaws due to human errors. These flaws make brick walls weak. Further, prevailing method of building a wall is labor & time consuming. Therefore an apparatus was invented to mitigate above problems. Two perpendicular rods are fixed as brick holders to level the wall. The distance between the shafts can be adjusted as per the width of the of the brick wall. Two additional shifters are fixed to put cement mixture into the cavities in a uniform way. With this apparatus the wastage of cement and time were largely reduced.
Awards (1)
- Fourth Award of $500 $500
Competition history
- ISEF 2017
Resources
Related projects
ISEF · 2019
Innovative Tree Branch Removing Device
ISEF · 2017
ESCOMBLOCK (Block Based on Debris)
ISEF · 2023
3D Printed Bricks Based Off Mud Dauber Wasp Nest
ISEF · 2025
Novel Implementation of Additive Construction Through Autonomous UAVs
Closest projects by meaning, across every fair and year in the corpus.
Source: Regeneron International Science and Engineering Fair