Building a Better Dam
CSEF · 2003 Materials Science (Junior Division Only)
Overview
Objectives/Goals The overall concept of this project is to determine if the size and shape of rock used in a rock fill dam will affect the permeability and saturation of the dam. Methods/Materials In order to accomplish this, several dams of various rock configurations were constructed using rock varying in texture and ranging in size from 1/8" to 3/4". A clay liner was placed at the bottom and sides of the dam in order to stop any water from penetrating in those areas. A specific amount of water was then poured towards each of the dams and timed to test the rock's holding power. The run-off water was measured to determine how much water was retained in the dam. The results were achieved by calculating the amount of water retained in the rock and the time it took the water to pass through the dam. Results After measuring the times and amounts of water retained in the dam, it was determined that the dam using a variety of smooth rock ranging from 1/8" to 3/4" was the best over-all design. Conclusions/Discussion Building a dam with smooth rocks of various sizes allowed for the least amount of permeation. This was a surprise as the greater amount of surface area on the rough rock would seem to have allowed for less permeation. The dams constructed completely with 1/8" rock retained the most water. This occurred because of the close proximity of the rock to each other, leaving little space for the water to escape. Further research could be conducted to test different types of rock such as volcanic, limestone, etc. The ability of dams to be effective can be determined by the materials used in their construction.
Summary statement
The varied size and shape of rock determines the permeability and saturation of rock fill dams.
Help received
All rock was donated by Lyngso Materials, Inc., My mother drove me to various locations and paid for other materials, my teacher Mr. Dolyniuk gave me class time to prepare this project. My inspiration was from my grandfather who designed and built the tallest dam in India in 1959.
Competition history
- CSEF 2003
Resources
Related projects
CSEF · 2003
Discovering the Porosity and Permeability of Different Types of Rocks and Minerals
CSEF · 2012
Chosen for Erosion
CSEF · 2009
The Effect of Different Soil Textures upon the Permeation Rate of Water
CSEF · 2010
Me and My Oil: Finding the Most Ideal Reservoir by Measuring Sedimentary Rock's Permeability and Porosity
CSEF · 2009
Which Filling Materials in Sandbags Block Floodwaters the Best?
CSEF · 2015
Let It Flow
CSEF · 2026
Holding Back the Flow: Designing Cutoff Walls to Prevent Potential Dam Failure
CSEF · 2009
Dam Science: Testing the Energy Efficiency of Varying Reservoir Dimensions behind a Hydroelectric Dam
Closest projects by meaning, across every fair and year in the corpus.
Browse more like this
Source: California Science & Engineering Fair public projects